CRITICAL POWER MANUFACTURER
THE CHALLENGE
Part of the customer’s critical power manufacturing process is the requirement for additional power. This enables them to perform vigorous tests required to commission their products. However, this additional power is only a temporary requirement and requires a short term turnkey rental solution.
THE SOLUTION
The entire turnkey package includes 4 x 1250kVA load sharing generators, an array of 8 x Load Banks, over 3km of 240mm cable. Orchestrated and delivered by our service deployment team meant delivery and installation happened on time and within budget.
Installation of rented 4 x 1250kVAs, with tanks and load banks
Installation of rented 4 x 1250kVAs, with tanks and load banks
Installation of rented 4 x 1250kVAs, with tanks and load banks
Installation of rented 4 x 1250kVAs, with tanks and load banks